Optimal Profit Analysis of Machine Repair Problem with Repair in Phases and Organizational Delay

Optimal Profit Analysis of Machine Repair Problem with Repair in Phases and Organizational Delay

Chandra Shekhar
Department of Mathematics, Birla Institute of Technology and Science Pilani, Pilani Campus, Pilani, Rajasthan, 333 031, India.

Praveen Deora
Department of Mathematics, Central University of Rajasthan, Kishangarh, Rajasthan, 305 817, India.

Shreekant Varshney
Department of Mathematics, Faculty of Science and Technology (ICFAI-Tech), The ICFAI Foundation for Higher Education, Hyderabad, 501 203, India.

Kunwar Pal Singh
Department of Mathematics, Government Degree College, Targawan Jaithra, Etah, Uttar Pradesh, 207 249, India.

Dinesh Chandra Sharma
Department of Mathematics, Central University of Rajasthan, Kishangarh, Rajasthan, 305 817, India.

DOI https://doi.org/10.33889/IJMEMS.2021.6.1.027

Received on August 04, 2020
  ;
Accepted on October 17, 2020

Abstract

In this article, we study machine repair problems (MRP) consisting of the finite number of operating machines with the provisioning of the finite number of warm standby machines under the care of a single unreliable server. For the machining system’s uninterrupted functioning, an operating machine is immediately replaced with the available warm standby machine in negligible switchover time whenever it fails. The concept of threshold vacation policy: N-policy is also considered. Under this vacation policy, the server starts to serve the failed machines on the accumulation of a pre-specified number of failed machines in the system. The server continues until the system is empty from the failed machines; after that, the server goes for vacation. The notion of an organizational delay, server breakdown, and repair in multiple phases is also conceptualized to build the studied model more realistic. The recursive matrix method is used to find steady-state queue size distribution, and subsequently, various system performance measures are also developed to validate the studied model. The optimal analysis has been performed to identify the critical design parameters for the governing model. The state-of-the-art of the present study is its mathematical modeling of the multi-machine stochastic problem with varied limitations and strategies. The methodology to obtain queue size distribution, optimal design parameters, is beneficial for dealing with other complex and sophisticated real-time machining problems in the service system, computer and communication system, manufacturing and production system, etc. The present problem is limited to fewer machines, which can be extended to more machines with different topologies with high computational facilities.

Keywords- Warm standby, Threshold vacation policy, Unreliable server, Organizational delay, Repair in phases.

Citation

Shekhar, C., Deora, P., Varshney, S., Singh, K. P., & Sharma, D. C. (2021). Optimal Profit Analysis of Machine Repair Problem with Repair in Phases and Organizational Delay. International Journal of Mathematical, Engineering and Management Sciences, 6(1), 442-468. https://doi.org/10.33889/IJMEMS.2021.6.1.027.